Bathroom installation and fitting

Bathroom fitters in Blackpool

Refits from the ground up, run start to finish by the people who quoted them. Plumbing, tiling, electrics and making good, on one schedule — so there is never a week where nobody turns up.

Gas Safe Registered, no. 505087Fixed itemised price8 to 10 working days

What a bathroom refit includes

  • Measured plan and a fixed itemised price before the first tile is ordered
  • Layout set out against the real soil pipe and studwork, not a showroom render
  • Strip out and waste removal, floors levelled, walls battened or boarded
  • Anything hidden — rot, failed joists, old lead pipe — reported and priced before it is covered back up
  • First fix plumbing in copper where it is visible, electrics for extractor, lighting and shaver point
  • Tanking and forming to fall in wet rooms and level-access showers
  • Plastering and tiling by trusted tradespeople we book and manage, inside the same price
  • Laser-set tiling or uPVC panelling, then sanitaryware, screens and brassware
  • Making good, silicone finish and a final clean before hand-back

How a refit runs

A refit touches plumbing, tiling, electrics and plastering, and it runs in this order. The plumbing, the gas and the running of the job are ours; plastering and tiling go to trusted tradespeople we have used for years and book ourselves. One schedule, one price, one person to ring.

01

Design and fixed price

We measure the room, agree the layout and set out where the soil pipe and studwork will actually allow the suite to go. You get an itemised price with every item named before anything is ordered.

02

Strip out and prepare

Old suite and tiles out, waste carried away, floors levelled and walls battened or boarded. Anything hidden — rot, failed joists, old lead — is reported and priced before we cover it back up.

03

First fix and tanking

Hot, cold and waste runs re-piped in copper where it is visible, electrics run for the extractor, lighting and shaver point. Wet rooms are tanked and formed to fall.

04

Tiling and finish

Tiled in porcelain, ceramic or natural stone, laser-set — or panelled in uPVC where you want the lower price and less grout to keep on top of. Suite, screens and brassware fitted, silicone finished, then the room is cleaned before we hand it back.

Wet rooms and level-access showers

The floor is tanked and formed to fall, and we check the joist depth first. On some upstairs floors a low-profile tray is the safer answer, and we will say so on the survey rather than after the tiles are down.

Bathroom specification

Typical duration
8 to 10 working days
Without a bathroom
4 to 6 days, dates given up front
Wet rooms
Tanked and formed to fall
Electrics
Part P certified extractor and lighting
Walls
Tiled, or uPVC panelled
Tiling
Porcelain, ceramic or natural stone
Sanitaryware
Trade supply, or fit your own
Guarantee
12 months on workmanship, plus manufacturer warranties

Recent bathroom work in Blackpool

A few of the jobs we have completed across Blackpool and the Fylde coast.

Bathroom refit, marble-effect walls and black brassware
Bathroom refit, marble-effect walls and black brassware
Walk-in shower with split-face stone
Walk-in shower with split-face stone
Bathroom refit, dark tile and navy vanity
Bathroom refit, dark tile and navy vanity
Family bathroom, twin basin and recessed lighting
Family bathroom, twin basin and recessed lighting
Tiled shower niche with concealed LED
Tiled shower niche with concealed LED
Cloakroom, wall-hung vanity
Cloakroom, wall-hung vanity
Bathroom refit with panelled bath and chrome brassware
Bathroom refit with panelled bath and chrome brassware
Shower room, large-format tiling
Shower room, large-format tiling

Bathroom questions

Do you supply the sanitaryware?
We can supply it at trade price, or fit what you have chosen yourself. Either way the quote lists exactly what is included.
Will I be without a bathroom the whole time?
Usually for four to six days in the middle of the job. We tell you which days on the schedule so you can plan around it, and we leave the water back on every evening.
Can you fit a level-access or wet-room shower?
Yes. The floor is tanked and formed to fall, and we check the joist depth first — on some upstairs floors a low-profile tray is the safer answer, and we will say so on the survey.
Do you do the tiling and plastering yourselves?
The plumbing, the gas work and the running of the job are ours. Plastering and tiling go to tradespeople we have used for years and book ourselves — you do not chase them, we do, and it is all in the one price we quoted you.

Tell us about the bathroom

Free survey, fixed written price, work booked around you.